Post Offer Free
BEIJING HORIZON TECHNOLOGY AND TRADE CO.,LTD  

Gold Index: 6484

You are here: home  > Cold Forging Rebar Coupler Threading Machine Two Cylinder For Splicing

Cold Forging Rebar Coupler Threading Machine Two Cylinder For Splicing 

Place of Origin: Beijing, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: HDCJ-32S

 
Cold Forging Rebar Coupler Threading Machine Two Cylinder For Splicing
 
<span style="font-

 

Cold Forging Rebar Coupler Threading Machine Two Cylinder For Splicing

 

   

 1. Product Description

     

       Quick details

       HDCJ-32S automatic double-cylinder rebar upsetting machine is used to enlarge the diameter of the   rebar head with high pressure, then make thread on it, which can make effective cross section of the   thread bigger than the base rebar. It can improve the quality of the joint and make joint’s compression and tensile strength bigger than the base rebar. The machine is used in high quality rebar splicing of national projects such as bridge and subway.

 

       Features

        The machine is easy to operate, with high quality and high speed, and not effected by environment. It is used in the forgoing processing of HRB335 and HRB400 rebar with diameter of 14-40mm.

 

     

       Main Technical Parameter

 

   Process Range  

   Rebar of Φ16—Φ32

   Motor Power

   Y132M-4 7.5KW

   Power Supply

   Three-phase four-wire 50HZ

   Hydraulic Pump

   10MCY14-1B 31.5MPa

   Hydraulic Oil

   68# hydraulic oil

   Weight    1000KG
   Size

   1250×850×1650mm

         

         

 

   2. Operation

 

1- Installation

 

       After the mold is installed, reset the stroke limiting bracket. Adjust the travel limit screw so that the stroke control in 15mm, insert the test steel bar to the top of the mold center hole press automation button. After the processing of the work-piece, measurement it. If failed, then adjust stroke limit screw to make the trip gradually increased, until processing of qualified products.

       

 

 2- Safety operation rules

1. Workers have to be trained and tested OK then can work.
2. Before operation with rebar, first running the machine 2-3 mins without processing, if it is running normally the process.
3. The feeding head of head should be plain and straight.
4. Before processing the rebar, the machine should be reset and then process

to ensure the same processing.
5. The processing rebar can not have the transverse cracks, when the equipment break down should be eliminated timely.
6. Oil should be 68# hydraulic oil.
7. Workers should obey the safety rules

 

3- Machine Failure and Exclusion         

                                                                                              

Trouble phenomenon Reason Method of exclusion
No action of cylinder Motor reverse Swap two-phase power supply
Electromagnetic spill valve failure Replace the electromagnetic spill
Low oil level Add hydraulic oil
Residual air in cylinder Empty run 3-5min
The cylinder can only run in one direction or the oil cylinder nonstop Solenoid valve Cards Find professional repair person
Die of steel Die wear Change mold
Small pressure Professional Surge
Mold cracking Too much pressure Replacement of mold, professional regulator
bigPhoto
 Mr. Ms. Bonnie

Tel: 86-10-87518920
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

BEIJING HORIZON TECHNOLOGY AND TRADE CO.,LTD [China (Mainland)]


Business Type:Manufacturer
City: Beijing
Province/State: Beijing
Country/Region: China (Mainland)

You May Like:

Product (137)